Kates-Kesler Five Milestone Design Process
This is a gated sequencing method for organization design rather than a design framework itself, since it explicitly borrows structure, reward, and decision right content from the Star Model, RAPID, and OKRs.
Amy Kates and Greg Kesler, 2011
The origin of the framework, as the directory records it. The mark grades the origin, not this page.
Umbrex, Kates-Kesler Five Milestone Design Process
The directory entry this score was read from. Umbrex is a consultancy network; its summary is the reference, not a primary source.
It loads no cell and describes no precondition, so it sits outside the canvas. That is a finding about the scope of the canvas, not a judgment of the framework.
Scored with no cells because its own contribution is milestone sequencing; the design content it produces is attributed to the frameworks it explicitly borrows from.
This is not a summary of the framework. Umbrex has one; the link under Sources goes there.
Nowhere on the sheet.