Scrum framework
Scrum time boxes work into sprints with an ordered backlog, daily inspection, and a sprint retrospective that closes the loop, covering Flow, Coordination, and Learning, while leaving authority, structure, and incentive design unspecified.
Ken Schwaber and Jeff Sutherland, 1995
The origin of the framework, as the directory records it. The mark grades the origin, not this page.
The directory entry this score was read from. Umbrex is a consultancy network; its summary is the reference, not a primary source.
Scored against the twelve cells, it loads three: Flow, Coordination, and Learning. The other nine it leaves to you. None of Composition, Evidence, or Mastery is among them, which is the usual result in this directory: the questions an agent in the loop raises first are the ones the literature answers least.
This is not a summary of the framework. Umbrex has one; the link under Sources goes there.
What limits throughput, and what is supposed to happen when the line stops?
What synchronizes the work when there is no room and half the team is not a person?
How does tacit judgment become reusable, and who owns the loop that has to close?
