Euler CenterWork Composition Run the assessment
Library / Concept

Statistical process control

Instrumentation instead of opinion, since 1924.

TypeConcept: an idea the canvas inherits
Cells it touchesEvidence · Learning
Sources, and how strong they are
Primary source

Walter Shewhart, Economic Control of Quality of Manufactured Product

1931; first control chart 1924

Shewhart's control chart separates variation inherent in a process from variation caused by a specific event. It is the origin of the idea that you should measure a system before you have views about it.

It sits in Evidence because the modern requirement, that a system produce its own trail as a byproduct of running rather than assembling one before an audit, is the same idea applied to agents.

Where it appears on the canvas Related entries
Correct this entryCorrections are made in public and credited by name.